Milestones
July 2013September 2013Aprill 2014
Berth Quay Wall Completed 400 m terminal and necessory facilities for operations. Completed 700 m terminal and necessory facilities for operations. Completed 1200 m terminal and necessory facilities for operations.
Berth Depth 18m 18m 18m
Access Channel 20m depth with two lane traffic access 20m depth with two lane traffic access 20m depth with two lane traffic access
Reefer Power 380 Points 760 Points 1150 Points
Quay Crenes
(Twin Lift)
3 Units
Rail Span - 30 m
Outreach - 70 m
W-load under hook - 75t
6 Units
Rail Span - 30 m
Outreach - 70 m
W-load under hook - 75t
12 Units
Rail Span - 30 m
Outreach - 70 m
W-load under hook - 75t
RTG/ ERTG 10 units
1HC over 6 HC
W-load under spreader - 40.5 t
20 units
1HC over 6 HC
W-load under spreader - 40.5 t
40 units
1HC over 6 HC
W-load under spreader - 40.5 t
Terminal Tractors 18 36 72
Container Tard 10Ha 20Ha 58Ha